It is a misconception to believe that hurricane anchor is placed in the foundation. On the contrary, hurricane anchors shall be installed in the roof truss chords and connected to a column or stiff wall.

Any wind force creates an uplift force in a building. These uplift forces are normally harmless and do not need to be taken into account since the weight of the structure will sufficiently counteract with the uplift force an nivellate it. However, it is a different story with a hurricane force wind. These exrtremely high wind forces create tremendously high uplift forces and will blow the roof away when the roof truss system is not properly anchored. The uplift reaction forces are transferred to the foundation via the hurricane anchors, whereas the foundation anchors also need to be designed to safely absorb these forces (it is normal engineering practice to oversize the foundation to utilize its weight to a factor of 1.2 x the total uplift force). 

BALI PREFAB WORLD applies vertical steel rods, tighlty installed onto the truss chords as to deal wth the calculated uplift forces.

So far all of our units built in a cyclone area have safely sustained a hurricane force wind:

In September 2004 one of our buildings withstood hurricane Ivan that struck the Cayman islands
In November 2009 a 2-storey unit designed and prefabricated by us lost only some roof tiles when the island of Sta. Lucia in the Caribbean was hit by hurricane Thomas
Eary November 2013 the Phillipines were hard hit by typhoon Haiyan. Our A-2 model sustained the 315 km/h (196 Mph) storm

 

 

 

 

 


 

 

Reviews from Bali Prefab World

"I would like to thank Bali Prefab World for the planning and completion of our Yoga Shala. They were very helpful in the preliminary stages, full of knowledge and expertise that we were comfortable in taking on their services. Our Spa resort is small, we were a little worried about noise which may of been caused from the building work. However, I would particularly like to point out how quiet, professional and timely Bali Prefab World's's team were during the whole process of the project. The workers were always smiling and polite in every way. Our building was completed on time to our satisfaction. It was a pleasure to work with Bali Prefab World and I wish them continued success".
Review from: Sharron Hopley, Reident manager YTL hotels, Singaraja, Bali
Project: 120 m2 Yoga building for the YTL hotel in Singaraja, Bali
Date: 02-03-2013
Rating: 4,5 out of 5.

Read more testimonials from Bali Prefab World: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Ask a question
Read our copyrights
X

Right Click

No right click allowed